Power button

Continuous operation tests find important bugs, partly as a result of their long operation and partly by increasing the probability of finding statistical bugs. However, CO tests also can introduce their own bugs. Mandating a periodic reset or reboot can work around these bugs, as well as save time and cost for testing, reproduction, debugging, and fix verification.

Original Article at Sticky Minds